No. Project Title
(HDD Method)
Location Name of Client Duration of Project Description of Work
Start End Pipe Size length
1 HDD Across Hou Lung River, Taiwan Taiwan Formosa Petrochemical Corporation 25-4- 06 26-7-06 4 way 12” API Steel Pipe 979m
2 Betara Complex Development, Jambi Province, Indonesia Indonesia Petrochina (Indonesia) Jabung Ltd. 20-2-04 17-9-04 10”, 8” & 6” API Steel Pipe – Simburnaik
10”, 8” & 6” API Steel Pipe – Batanghari River
876m

564m
3 Inter Refinery Pipeline (IRP) For Takreer, Abu Dhabi, UAE Project No. 6089 Abu Dhabi UAE Dodsal Pte Ltd 24-12-06 25-2-07 30” & 12 “ Casing Pipe 1500m
4 HDD Works at R-Jen River, Taiwan Taiwan China Petroleum Corporation     1 x 12”Ø & 2 x 8” API Pipe 577m
5 EPCC of NGDS to Pulau Indah – West Port FL Stage 1/05 Pulau Indah, Port Klang, Selangor Selangor,
Malaysia
Gas Malaysia 9-5-05 31-3-06 16” API Steel Pipe 934m
6 HDD Work at Pintu Gedung Port Klang, Segment “G” Selangor,
Malaysia
TT dotcom S/B     5½ “ HT Pipe for Fiber Optic 940m
7 The Design, Construction, Supply & Installation, Testing & Commissioning & Completion of the Telecommunication Network Selangor,
Malaysia
TT dotcom S/B 24-2-05
31-3-05
23-3-05
26-4-05
4 way 110mm Ø HDPE Duct PN10
2 way 110mm Ø HDPE Duct PN10
75m
110m
8 Installation, Testing & Commissioning of Duct Infrastructure Network Malaysia Maxis Broadband S/B 3-1- 03

19-1-03


23-10-04
16-1-03

8-4-03


4-5-05
2 way 110mm Ø HDPE Duct PN10
2 Way PVC Duct 100mm
2 way 110mm Ø HDPE Duct PN10
2 Way PVC Duct 100mm
2 way GI 100mm
2 way 110mm Ø HDPE Duct PN 10
2 way PVC Duct 100mm
2 way GI 100mm
140m
407m
180m
3848m
330m
163m
883m
180m
9 Supply of Horizontal Directional Drilling Works Across Jalan Permas Jaya, Johor Jaya for Singapore Gas Pipeline Johor,
Malaysia
Kumpulan Juruteknik S/B 4-1-06 15-1-06 24” Carbon Steel Pipe 60m
 
No. Project Title
(Pipe Jacking Method)
Location Name of Client Duration of Project Description of Work
Start End Pipe Size length
1 Construction of KL Sewerage Treatment Plant
(STP) Phase 1, Package 1 – Old Klang Road
Trunk Sewer and Jalan Dang Wangi
Kuala
Lumpur,
Malaysia
Kejuruteraan Bintai
Kindenko S/B
1-7-04 31-6-07 375mm Ø RCJP
450mm Ø RCJP
600mm Ø RCJP
750mm Ø RCJP
1200mm Ø RCJP
1350mm Ø RCJP
1500mm Ø RCJP
194m
165m
1580m
365m
1930m
774m
510m
2 Project Rangkaian Paip Pembetungan Kangar,
Perlis Indera Kayangan
Perlis,
Malaysia
Unipenta S/B 1-7-04 31-12-07 450
600
750
900
1050
890m
1245m
2414m
776m
40m
3 North-South Expressway
Proposed Modification of Non-Stop Through
Traffic Between Ipon(s) to Jelapang (Package 5)
Perak,
Malaysia
Franky Construction
S/B
6-3-06 31-6-07 1200mm Ø RCJP
1500mm Ø RCJP
33m
47m
4 Duta-Ulu Kelang Expressway (Duke) for Section 2
Relocation of Sewerage Pipes at Section 2
Kuala
Lumpur,
Malaysia
Eng Han Bina
S/B
1-5-07 31-7-07 7500mm Ø RCJP Class ‘2Z’ 130m
5 North-South Expressway Proposed Third Lane
Widening between Raqang and Tanjung Malim
Selangor,
Malaysia
Minetech
Construction S/B
10-2-06 3-5-06 2100mm Ø RCJP 252m
6 Sungai Selangor Phase 3, Bukit Badong
Distribution Wroks from New FRIM Resevoir to
Dusun Kubung Reservoir – Package 2
SYABAS Project
Selangor,
Malaysia
Strength Wheel
Construction S/B
14-11-05 28-2-06 1450mm Ø Concrete Chladded Pipes 32m
7 Proposed Distribution Works from New FRIM
Resevoir to Dusun Kubung Resevoir (Package 2)
– Construction & Completion of 1400mm DN
Concrete Cladded Steel Pipe Jacking Works
SYABAS Project
Melaka,
Malaysia
Konajaya S/B
Selangor
21-10-05 31-12-05 1440mm Ø Concrete Chladded Pipes 48m
8 Design, Construction, Completion, Testing,
Commissioning and Handing Over of Pipe Jacking
Wroks
Selangor,
Malaysia
Perunding CMF S/B 25-7-05 15-8-06 1800mm Ø RCJP 150m
9 Proposed Construction and Completion of the
Remaining Phae 1 Sungai Besi Trunk Sewer and
Ancilarry Sewerage Works at Sungai Besi, KL
Kuala
Lumpur,
Malaysia
Bina Water S/B 13-10-04 28-1-05 1500mm Ø 2H 160.36m
10 Cadangan membina Jalan Raya Durian Tunggal –
Paya Rumput – Sungai Udang, Melaka – RC Box
Culvert Jacking
Melaka,
Malaysia
Ho Hup Construction
& Engineering S/B
9-10-02 15-3-03 2.7m x 2.7m - (Box Culvert) 27m
11 Jambatan Sayong di atas Sungai Perak – Culvert
CI below Road Crossing
Perak,
Malaysia
Latimer Corporation
S/B
22-10-01 22-12-02 3.5m x 3.5m – (Box Culvert) 20m
Detail information upon request