| No. |
Project Title
(HDD Method) |
Location |
Name of Client |
Duration of Project |
Description of Work |
| Start |
End |
Pipe Size |
length |
| 1 |
HDD Across Hou Lung River, Taiwan |
Taiwan |
Formosa Petrochemical Corporation |
25-4- 06 |
26-7-06 |
4 way 12” API Steel Pipe |
979m |
| 2 |
Betara Complex Development, Jambi Province, Indonesia |
Indonesia |
Petrochina (Indonesia) Jabung Ltd. |
20-2-04 |
17-9-04 |
10”, 8” & 6” API Steel Pipe – Simburnaik
10”, 8” & 6” API Steel Pipe – Batanghari River |
876m
564m |
| 3 |
Inter Refinery Pipeline (IRP) For Takreer, Abu Dhabi, UAE Project No. 6089 |
Abu Dhabi
UAE |
Dodsal Pte Ltd |
24-12-06 |
25-2-07 |
30” & 12 “ Casing Pipe |
1500m |
| 4 |
HDD Works at R-Jen River, Taiwan |
Taiwan |
China Petroleum Corporation |
|
|
1 x 12”Ø & 2 x 8” API Pipe |
577m |
| 5 |
EPCC of NGDS to Pulau Indah – West Port FL Stage 1/05 Pulau Indah, Port Klang, Selangor |
Selangor,
Malaysia |
Gas Malaysia |
9-5-05 |
31-3-06 |
16” API Steel Pipe |
934m |
| 6 |
HDD Work at Pintu Gedung Port Klang, Segment “G” |
Selangor,
Malaysia |
TT dotcom S/B |
|
|
5½ “ HT Pipe for Fiber Optic |
940m |
| 7 |
The Design, Construction, Supply & Installation, Testing & Commissioning & Completion of the Telecommunication Network |
Selangor,
Malaysia |
TT dotcom S/B |
24-2-05
31-3-05 |
23-3-05
26-4-05 |
4 way 110mm Ø HDPE Duct PN10
2 way 110mm Ø HDPE Duct PN10 |
75m
110m |
| 8 |
Installation, Testing & Commissioning of Duct Infrastructure Network |
Malaysia |
Maxis Broadband S/B |
3-1- 03
19-1-03
23-10-04 |
16-1-03
8-4-03
4-5-05 |
2 way 110mm Ø HDPE Duct PN10
2 Way PVC Duct 100mm
2 way 110mm Ø HDPE Duct PN10
2 Way PVC Duct 100mm
2 way GI 100mm
2 way 110mm Ø HDPE Duct PN 10
2 way PVC Duct 100mm
2 way GI 100mm |
140m
407m
180m
3848m
330m
163m
883m
180m |
| 9 |
Supply of Horizontal Directional Drilling Works Across Jalan Permas Jaya, Johor Jaya for Singapore Gas Pipeline |
Johor,
Malaysia |
Kumpulan Juruteknik S/B |
4-1-06 |
15-1-06 |
24” Carbon Steel Pipe |
60m |
| |
| No. |
Project Title
(Pipe Jacking Method) |
Location |
Name of Client |
Duration of Project |
Description of Work |
| Start |
End |
Pipe Size |
length |
| 1 |
Construction of KL Sewerage Treatment Plant
(STP) Phase 1, Package 1 – Old Klang Road
Trunk Sewer and Jalan Dang Wangi |
Kuala
Lumpur,
Malaysia |
Kejuruteraan Bintai
Kindenko S/B |
1-7-04 |
31-6-07 |
375mm Ø RCJP
450mm Ø RCJP
600mm Ø RCJP
750mm Ø RCJP
1200mm Ø RCJP
1350mm Ø RCJP
1500mm Ø RCJP |
194m
165m
1580m
365m
1930m
774m
510m |
| 2 |
Project Rangkaian Paip Pembetungan Kangar,
Perlis Indera Kayangan |
Perlis,
Malaysia |
Unipenta S/B |
1-7-04 |
31-12-07 |
450
600
750
900
1050 |
890m
1245m
2414m
776m
40m |
| 3 |
North-South Expressway
Proposed Modification of Non-Stop Through
Traffic Between Ipon(s) to Jelapang (Package 5) |
Perak,
Malaysia |
Franky Construction
S/B |
6-3-06 |
31-6-07 |
1200mm Ø RCJP
1500mm Ø RCJP |
33m
47m |
| 4 |
Duta-Ulu Kelang Expressway (Duke) for Section 2
Relocation of Sewerage Pipes at Section 2 |
Kuala
Lumpur,
Malaysia |
Eng Han Bina
S/B |
1-5-07 |
31-7-07 |
7500mm Ø RCJP Class ‘2Z’ |
130m |
| 5 |
North-South Expressway Proposed Third Lane
Widening between Raqang and Tanjung Malim |
Selangor,
Malaysia |
Minetech
Construction S/B |
10-2-06 |
3-5-06 |
2100mm Ø RCJP |
252m |
| 6 |
Sungai Selangor Phase 3, Bukit Badong
Distribution Wroks from New FRIM Resevoir to
Dusun Kubung Reservoir – Package 2
SYABAS Project |
Selangor,
Malaysia |
Strength Wheel
Construction S/B |
14-11-05 |
28-2-06 |
1450mm Ø Concrete Chladded Pipes |
32m |
| 7 |
Proposed Distribution Works from New FRIM
Resevoir to Dusun Kubung Resevoir (Package 2)
– Construction & Completion of 1400mm DN
Concrete Cladded Steel Pipe Jacking Works
SYABAS Project |
Melaka,
Malaysia |
Konajaya S/B
Selangor |
21-10-05 |
31-12-05 |
1440mm Ø Concrete Chladded Pipes |
48m |
| 8 |
Design, Construction, Completion, Testing,
Commissioning and Handing Over of Pipe Jacking
Wroks |
Selangor,
Malaysia |
Perunding CMF S/B |
25-7-05 |
15-8-06 |
1800mm Ø RCJP |
150m |
| 9 |
Proposed Construction and Completion of the
Remaining Phae 1 Sungai Besi Trunk Sewer and
Ancilarry Sewerage Works at Sungai Besi, KL |
Kuala
Lumpur,
Malaysia |
Bina Water S/B |
13-10-04 |
28-1-05 |
1500mm Ø 2H |
160.36m |
| 10 |
Cadangan membina Jalan Raya Durian Tunggal –
Paya Rumput – Sungai Udang, Melaka – RC Box
Culvert Jacking |
Melaka,
Malaysia |
Ho Hup Construction
& Engineering S/B |
9-10-02 |
15-3-03 |
2.7m x 2.7m - (Box Culvert) |
27m |
| 11 |
Jambatan Sayong di atas Sungai Perak – Culvert
CI below Road Crossing |
Perak,
Malaysia |
Latimer Corporation
S/B |
22-10-01 |
22-12-02 |
3.5m x 3.5m – (Box Culvert) |
20m |